Customization: | Available |
---|---|
After-sales Service: | One-Year Warranty for The Whole Machine |
Warranty: | Three-Year Warranty for Important Parts |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mode | LB-0.6 | LB-1.2 | LB-1.8 | LB-2.5 | LB-0.6F | LB-1.2F | LB-1.8F | LB-2.5F |
Dimension-W*D*H (mm) | 680*700*2000 | 1250*700*2000 | 1875*700*2000 | 2500*700*2000 | 680*700*2000 | 1250*700*2000 | 1875*700*2000 | 2500*700*2000 |
Net Capacity (L) | 830 | 1150 | 1560 | 2050 | 830 | 1150 | 1560 | 2050 |
Net weight | 220KG | 300KG | 360KG | 400KG | 220KG | 300KG | 360KG | 400KG |
Gross weight | 245KG | 330KG | 390KG | 440KG | 245KG | 330KG | 390KG | 440KG |
Temp range(ºC) | 2~8ºC | ≤-18ºC | ||||||
Door | Double glazing With Low-E coated glass | Triple glazed electrically heated glass | ||||||
material | Coated Steel | Coated Steel | ||||||
Isolation Material | C5H10 | C5H10 | ||||||
Panel | C-P, 70mm | C-P, 70mm | ||||||
Plug | Customer choice | Customer choice | ||||||
Color | Customer choice | Customer choice | ||||||
Internal lighting | LED lights | LED lights | ||||||
Compressor | Secop | Secop | ||||||
Refrigerant | R404A/R290 | R404A/R290 | ||||||
Evaporator | Copper tube | Copper tube | ||||||
Fan | EBM | EBM | ||||||
Thermostat | Digital :Elitech / Dixell / Hkreco / Angel | Digital :Elitech / Dixell / Hkreco / Angel | ||||||
Wheels | 4 adjustable wheels | 4 adjustable wheels | ||||||
Cooling System | Air Cooling | Air Cooling | ||||||
Voltage/Frequency | 110V/60HZ;220V/50HZ;220V/60HZ | 110V/60HZ;220V/50HZ;220V/60HZ | ||||||
Type of protection against electric shock | I | I | ||||||
Climate type | N-ST | N-ST | ||||||
Warranty | One year for the whole machine, three years for important parts | One year for the whole machine, three years for important parts | ||||||
Lead Time | 2~3 weeks upon receipt of advance payment. | 2~3 weeks upon receipt of advance payment. | ||||||
Payment | T/T , 50% deposit in advance , 50% before shipment | T/T , 50% deposit in advance , 50% before shipment | ||||||
Certificate | CE/CB/ETL/ROHS/UL/IEC | CE/CB/ETL/ROHS/UL/IEC |
1. Q: How about the quality?
A: We use all the best high quality raw material and professional produce.